Carowinds

The Coaster101 Podcast: Rip Roarin’ Falls Media Day with TEA @ UNC

Carowinds’ New Rip Roarin’ Falls Ride Construction Goes VERTICAL

Carowinds goes vertical on Rip Roarin' Falls construction

The Coaster101 Podcast: Inside Rip Roarin’ Falls at Carowinds with Whitewater Engineer David Chesney

Walk time: Tell a story, or else

Last call for Tidal Force at Hersheypark

Carowinds adding log flume with 100-foot drop

A Look Inside Rip Roarin’ Falls Construction Site

Carowinds plans record-setting log flume ride for 2027

Carowinds’ newest ride promises three world records and one very big splash